Wednesday Aug 14, 2019 Friday Aug 16, 2019
August 14-16, 2019
8 AM - 5 PM
Canal Park Lodge, 250 Canal Park Dr, Duluth, MN
218-279-6000
$115 Members
$230 Non-Members
763-633-4271
Send Email
4.1 Vapor Distribution Systems
Layout, Design and Selection on a Vapor Distribution System-
Areas covered include using architectural and construction drawings; determining system load and customer demand; designing DOT (exchange and stationary) aboveground ASME and underground ASME installations; determining proper corrosion protection for tanks/piping; selecting regulators, piping tubing, vapor meters, and estimating job costs.