Tuesday Aug 28, 2018 Thursday Aug 30, 2018
Canal Park Lodge, 250 Canal Park Dr, Duluth, MN
218-279-6000
763-633-4271
Send Email
4.1 Vapor Distribution Systems
Layout, Design and Selection on a Vapor Distribution System-
Areas covered include using architectural and construction drawings; determining system load and customer demand; designing DOT (exchange and stationary) aboveground ASME and underground ASME installations; determining proper corrosion protection for tanks/piping; selecting regulators, piping tubing, vapor meters, and estimating job costs.